Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Klickitat County
Improvement of the 2026 Annual Striping Program: the work to be performed under these specifications includes to the installation fo yellow skip, no-pass, white edge pavement markings, painted and plastic pavement markings. Paint lines and/or markings shall be applied with paint that complies with the specifications for low VOC waterborne paint and plastic pavement markings shall be type A. Phase 1 is to be completed early summer 2026, work will consist of restriping all lane lines, striping some newly paved or seal coasted surfaces and installing new painted and/or plastic pavement markings in specified locations. Phase 2 consists of striping the remaining newly paved or seal coated surfaces, striping areas that were not previously stiped or areas that have been determined to need another coat of paint, finishing new plastic pavement markings and other work.
Posted Date
Feb 25, 2026
Due Date
Mar 17, 2026
Release: Feb 25, 2026
Klickitat County
Close: Mar 17, 2026
Improvement of the 2026 Annual Striping Program: the work to be performed under these specifications includes to the installation fo yellow skip, no-pass, white edge pavement markings, painted and plastic pavement markings. Paint lines and/or markings shall be applied with paint that complies with the specifications for low VOC waterborne paint and plastic pavement markings shall be type A. Phase 1 is to be completed early summer 2026, work will consist of restriping all lane lines, striping some newly paved or seal coasted surfaces and installing new painted and/or plastic pavement markings in specified locations. Phase 2 consists of striping the remaining newly paved or seal coated surfaces, striping areas that were not previously stiped or areas that have been determined to need another coat of paint, finishing new plastic pavement markings and other work.
AvailableKlickitat County
This contract includes jacking the existing superstructure to replace/reset the existing deficient bearing pads, repair damaged bearing seats as required and other work on structures 08665000, 08581700, 08211300, 08157300 and 08045300.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Klickitat County
Close: Jan 13, 2026
This contract includes jacking the existing superstructure to replace/reset the existing deficient bearing pads, repair damaged bearing seats as required and other work on structures 08665000, 08581700, 08211300, 08157300 and 08045300.
Klickitat County
The project includes the complete work necessary for the Community College (tenant) aviation maintenance technology (CGCC AMT) facility and consists of one building totaling approx. 10,000 SF a fully sprinklered, two-story structure with concrete slab on grade floor with a wood framed partial second floor contained inside the pre-engineered metal building (PEMB), varying in clear height. A full interior for first floor and limited second floor are planned to include fire protection, plumbing, mechanical, and electrical fit-out. A second approx, 440 SF one-story structure with concrete slab on grade floor will be constructed adjacent to and part of the main building and will act as the enclosure for the horizontal rolling hangar door. Building related site work consisting of excavation/grading, hard surfacing, landscaping, seeding, site amenities, and installation of storm, water, sanitary waste, and other utilities is also included.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Klickitat County
Close: Jan 6, 2026
The project includes the complete work necessary for the Community College (tenant) aviation maintenance technology (CGCC AMT) facility and consists of one building totaling approx. 10,000 SF a fully sprinklered, two-story structure with concrete slab on grade floor with a wood framed partial second floor contained inside the pre-engineered metal building (PEMB), varying in clear height. A full interior for first floor and limited second floor are planned to include fire protection, plumbing, mechanical, and electrical fit-out. A second approx, 440 SF one-story structure with concrete slab on grade floor will be constructed adjacent to and part of the main building and will act as the enclosure for the horizontal rolling hangar door. Building related site work consisting of excavation/grading, hard surfacing, landscaping, seeding, site amenities, and installation of storm, water, sanitary waste, and other utilities is also included.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Skip; the county avoids this path—steer to coops/resellers.
Coops: Use Sourcewell, OMNIA Partners, or BuyBoard to purchase quickly.
Klickitat County, WA demonstrates a documented aversion to sole source; no confirmed awards found in public records.
Board meetings and strategic plans from Klickitat County
This document outlines a conceptual framework for water management strategies within the WRIA 30 Klickitat River Watershed. It evaluates existing water banking programs and proposes a Water Exchange Program to address water supply issues and demands. Key goals include establishing a centralized information resource center, creating a water market, streamlining water right transfer processes, promoting beneficial use and conservation of water rights, and creating a water bank. The framework aims to protect and facilitate the use of existing surface and groundwater rights.
The meeting included updates on measles cases in Washington State and across the country, as well as changes for COVID-19 vaccines at the federal level. An overview of the 988 system in Washington State was presented, including data for Klickitat County's 988 volume. There was a discussion regarding employees, staffing roles, and support crisis services in the county. The approval of the 2025 Federal Poverty Level Fee Schedule was also on the agenda. Public Health's efforts in promoting 988 across the county were highlighted.
The meeting included a department update from the Treasurer regarding a surplus sale planned for May, featuring items including soil from the Columbia Gorge airport. There was discussion about the logistics of the sale, including setting a minimum bid and how the funds would be managed and distributed to the city. The commissioners also proclaimed National Volunteer Week and Eric Brian Johnson Day. Additionally, there was an update from the Klickitat and Skamania County Developmental Disability Advisory Board, focusing on their activities and the need for new members.
The workshop focused on the 2021 budget and preparation for the 2022 budget process. Key discussion points included the landfill revenues, historical data, and the allocation of funds. The board reviewed a graph of landfill revenues from 2011 to 2020, and discussed the allocation of landfill revenue, the impact of COVID-19 on expenses, and the potential use of American Rescue Plan funds.
The meeting included discussions on a Fairgrounds partial fee waiver request from the rodeo Bible camp, a supplemental agreement with Felton fire services for inspections, and a letter of support for the Washington State historic County Courthouse Rehabilitation grant program. Updates were provided on construction projects, including the Courtney Road project and the Roosevelt grade Paving project. The annual striping was discussed, as well as the Courthouse parking lots. The board also talked about bridge call for projects and FEMA.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Klickitat County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Klickitat County's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database