S. Winland Drive Surfacing Project - 26EN21 RFP
Posted
Aug 27, 2026
Sep 16, 2026
Work includes approx. of 70 LF of install 6" water main; 10 LF of install 8" sanitary sewer; 40 LF of install 24" CMP storm drain pipe; 20 LF of install 18" RCP storm drain pipe; 2,167 LF of rotomilling surface of asphalt pavement; 2,399 SY of 2.5" asphaltic concrete paving; 1,179 SY of 6" asphaltic concrete paving; 540 SF of install replacement concrete valley gutter (8").