ATV/UTV Trail Re-Route, Oak Ridge Loop
Posted
Sep 16, 2026
Oct 9, 2026
Re-route approx. 3,500 FT of ATV/UTV trail off of the Viking Gas pipeline in section 3 of North Foster Township. Technical specs - mulching/clearing: clearing vegetation and large trees, mulching brush, stump removal. Stripping soil, repurpose stripped soil. Culvert install - one 24" X 24" culvert and remove old culvert, riprap for culvert ends.
