Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Manly's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Manly
Main Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
City of Manly
Close: Jan 27, 2026
Main Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
AvailableCity of Manly
Contract 1: Sanitary sewer rehabilitation including cleaning and televising, heavy cleaning, 6,454 LF of CIPP lining, 60 LF of pipe replacement, service grouting, manhole vertical lining of 400 VF, manhole grouting of 23 manholes, installation of one new manhole, new manhole castings at 20 locations, new manhole boxouts and castings at an additional 55 locations, manhole adjustments at 12 locations, installation of concrete fillets at 17 locations, street removal and replacement. Restoration of grassy areas, pavement, and granular surfacing. Contract 2: Sanitary sewer collection system improvements including the removal of existing gravity sewer and installation of new gravity sewer for a total of 810 LF, service reconnections using wyes, installation of sanitary sewer force main piping using trenchless methods of 2,150 LF, installation of sanitary sewer force main with steel casing pipe using trenchless methods of 200 LF, sanitary sewer abandonment using plug and fill methods of 1,185 LF, lift station improvements, installation of a sewage air release valve pit, manhole drop connection, and connection to existing manholes. Restoration of grassy areas, pavement, and granular surfacing. Construction of site work, electrical/mechanical work associated with the improvements, as well as start-up services and restoration.
Posted Date
Feb 20, 2025
Due Date
Mar 12, 2025
Release: Feb 20, 2025
City of Manly
Close: Mar 12, 2025
Contract 1: Sanitary sewer rehabilitation including cleaning and televising, heavy cleaning, 6,454 LF of CIPP lining, 60 LF of pipe replacement, service grouting, manhole vertical lining of 400 VF, manhole grouting of 23 manholes, installation of one new manhole, new manhole castings at 20 locations, new manhole boxouts and castings at an additional 55 locations, manhole adjustments at 12 locations, installation of concrete fillets at 17 locations, street removal and replacement. Restoration of grassy areas, pavement, and granular surfacing. Contract 2: Sanitary sewer collection system improvements including the removal of existing gravity sewer and installation of new gravity sewer for a total of 810 LF, service reconnections using wyes, installation of sanitary sewer force main piping using trenchless methods of 2,150 LF, installation of sanitary sewer force main with steel casing pipe using trenchless methods of 200 LF, sanitary sewer abandonment using plug and fill methods of 1,185 LF, lift station improvements, installation of a sewage air release valve pit, manhole drop connection, and connection to existing manholes. Restoration of grassy areas, pavement, and granular surfacing. Construction of site work, electrical/mechanical work associated with the improvements, as well as start-up services and restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.