Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract 1: Sanitary sewer rehabilitation including cleaning and televising, heavy cleaning, 6,454 LF of CIPP lining, 60 LF of pipe replacement, service grouting, manhole vertical lining of 400 VF, manhole grouting of 23 manholes, installation of one new manhole, new manhole castings at 20 locations, new manhole boxouts and castings at an additional 55 locations, manhole adjustments at 12 locations, installation of concrete fillets at 17 locations, street removal and replacement. Restoration of grassy areas, pavement, and granular surfacing. Contract 2: Sanitary sewer collection system improvements including the removal of existing gravity sewer and installation of new gravity sewer for a total of 810 LF, service reconnections using wyes, installation of sanitary sewer force main piping using trenchless methods of 2,150 LF, installation of sanitary sewer force main with steel casing pipe using trenchless methods of 200 LF, sanitary sewer abandonment using plug and fill methods of 1,185 LF, lift station improvements, installation of a sewage air release valve pit, manhole drop connection, and connection to existing manholes. Restoration of grassy areas, pavement, and granular surfacing. Construction of site work, electrical/mechanical work associated with the improvements, as well as start-up services and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes approximately 4,400 LF of sanitary sewer lining, 16 spot repairs, and 25 manhole adjustments.
Posted Date
Jan 9, 2026
Due Date
Feb 12, 2026
Release: Jan 9, 2026
Close: Feb 12, 2026
Project includes approximately 4,400 LF of sanitary sewer lining, 16 spot repairs, and 25 manhole adjustments.
AvailableThe project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
The project consists of sanitary sewer construction including relevant residential sewage collection systems, pump stations and mainline connections.
AvailableMain Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
Posted Date
Jan 12, 2026
Due Date
Jan 27, 2026
Release: Jan 12, 2026
Close: Jan 27, 2026
Main Street Sidewalk Improvement Project contract generally described as follows: Sidewalk improvements on Main Street between S Todd Street and S Broadway Street including, but not limited to pavement removals, roadway lighting, curb and gutter, sidewalk, traffic control, surface restoration, and other associated appurtenances as specified and indicated on the drawings.
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis