Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Harrington
Perform a scope of work that includes providing engineering services for wastewater plant upgrades.
Posted Date
Mar 27, 2026
Due Date
Apr 3, 2026
Release: Mar 27, 2026
City of Harrington
Close: Apr 3, 2026
Perform a scope of work that includes providing engineering services for wastewater plant upgrades.
City of Harrington
Work consists of removal and replacement of various ADA ramps. The project will remove and replace 22 ADA ramps. Includes 400 SY removing cement conc. sidewalk; 50 CY crushed surfacing top course for curb and gutter, sidewalk and curb ramps; 261 SY HMA for pavement repair CL 3/8" PG 64-28. 2.5" thick; 3 EA adjust existing valve box or clean out; 380 ST concrete conc. sidewalk; 410 SF painted crosswalk line.
Posted Date
May 29, 2025
Due Date
Jun 26, 2025
Release: May 29, 2025
City of Harrington
Close: Jun 26, 2025
Work consists of removal and replacement of various ADA ramps. The project will remove and replace 22 ADA ramps. Includes 400 SY removing cement conc. sidewalk; 50 CY crushed surfacing top course for curb and gutter, sidewalk and curb ramps; 261 SY HMA for pavement repair CL 3/8" PG 64-28. 2.5" thick; 3 EA adjust existing valve box or clean out; 380 ST concrete conc. sidewalk; 410 SF painted crosswalk line.
City of Harrington
Install a new micro strainer, retrofit an existing setting basin with moving bed biofilm reactors, refurbish an existing aeration cell, modify dosing system, modify return weir, new aeration basin bypass line, new groundwater monitoring wells, and appurtenances to facilitate the treatment plant modifications.
Posted Date
Feb 7, 2025
Due Date
Mar 12, 2025
Release: Feb 7, 2025
City of Harrington
Close: Mar 12, 2025
Install a new micro strainer, retrofit an existing setting basin with moving bed biofilm reactors, refurbish an existing aeration cell, modify dosing system, modify return weir, new aeration basin bypass line, new groundwater monitoring wells, and appurtenances to facilitate the treatment plant modifications.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track City of Harrington's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database