Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Algona
Schedule A: Resurface asphalt on three roadway segments - Approx. 725 LF of Second Avenue North; approx. 425 LF of Seattle Boulevard; and approx. 800 LF of Third Avenue North. Schedule B: Remove and replace approx. 570 LF of 8" PVC sanitary sewer line. Improvements include temp pumping of sanitary sewer, trench patching, removal and reconstruction of limited pavement areas, pavement planing, pavement markings, and traffic control.
Posted Date
Apr 30, 2026
Due Date
May 14, 2026
Release: Apr 30, 2026
City of Algona
Close: May 14, 2026
Schedule A: Resurface asphalt on three roadway segments - Approx. 725 LF of Second Avenue North; approx. 425 LF of Seattle Boulevard; and approx. 800 LF of Third Avenue North. Schedule B: Remove and replace approx. 570 LF of 8" PVC sanitary sewer line. Improvements include temp pumping of sanitary sewer, trench patching, removal and reconstruction of limited pavement areas, pavement planing, pavement markings, and traffic control.
City of Algona
Construction of non-motorized improvements along Algona Boulevard from Boundary Boulevard, south approx 7,150 feet to 5th Avenue. Improvements include, but are not limited to, extruded curb, cement concrete sidewalk, isolated asphalt pavement repair areas, pavement markings, traffic control, and other miscellaneous items. Includes 280 LF Removal of Curb and Gutter; 50 SY Removal of Cement Concrete Flatwork; 8 EA Drainage Cut for Existing Curb; 100 TN Crushed Surfacing Top Course; 200 LF Crack Sealing Bit. Pvmt., 1/4 Inch to 1 Inch (5-03.5); 42 TN HMA for Pavement Repair Cl. 1/2" PG 58H-22 (5-04.5); 4,650 LF Extruded Cement Concrete Curb (8-04.5); 360 LF Painted Crosshatch Marking (8-22.5).
Posted Date
Sep 19, 2025
Due Date
Oct 6, 2025
Release: Sep 19, 2025
City of Algona
Close: Oct 6, 2025
Construction of non-motorized improvements along Algona Boulevard from Boundary Boulevard, south approx 7,150 feet to 5th Avenue. Improvements include, but are not limited to, extruded curb, cement concrete sidewalk, isolated asphalt pavement repair areas, pavement markings, traffic control, and other miscellaneous items. Includes 280 LF Removal of Curb and Gutter; 50 SY Removal of Cement Concrete Flatwork; 8 EA Drainage Cut for Existing Curb; 100 TN Crushed Surfacing Top Course; 200 LF Crack Sealing Bit. Pvmt., 1/4 Inch to 1 Inch (5-03.5); 42 TN HMA for Pavement Repair Cl. 1/2" PG 58H-22 (5-04.5); 4,650 LF Extruded Cement Concrete Curb (8-04.5); 360 LF Painted Crosshatch Marking (8-22.5).
City of Algona
Work includes removal and reconstruction of limited pavement areas, pavement planing, asphalt paving, replacement of curb ramps, traffic signal loop replacement, pedestrian push button modifications, pavement marking and traffic control.
Posted Date
Jun 14, 2024
Due Date
Jun 27, 2024
Release: Jun 14, 2024
City of Algona
Close: Jun 27, 2024
Work includes removal and reconstruction of limited pavement areas, pavement planing, asphalt paving, replacement of curb ramps, traffic signal loop replacement, pedestrian push button modifications, pavement marking and traffic control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $10,000, use sole source.
Coops: Frequently procures through OMNIA Partners, TIPS-USA for the library, or Washington State DES; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
City of Algona, WA
Threshold/context: Very low $10,000 ceiling; no observed sole source awards.
Board meetings and strategic plans from City of Algona
The council discussed the annual transportation improvements plan, which includes citywide curb and sidewalk improvements and resurfacing projects for various streets. The meeting also addressed concerns regarding public works maintenance, including the condition of a parade route and the presence of an RV. The council reviewed appointments and discussed the status of various conditional use permits and apartment project timelines. Reports were presented on conferences attended by council members, including updates on city management and leadership training. Additionally, the police department reported on Fourth of July holiday activities, staffing status, and ongoing efforts to manage e-bike usage and park closures. Financial updates were provided, including approval of a sewer rate increase and a call for participants for the salary commission.
The council conducted a workshop primarily focused on the Law Enforcement Assisted Diversion (LEAD) program, including its funding structure, operational partnership with the City of Des Moines, case management model, and referral processes aimed at diverting individuals with unmet needs from the criminal justice system. Additionally, the council discussed the role of crisis connection centers and 23-hour facilities in providing mental health care and addressing crises. The session also covered financial reporting related to grant funding and vendor coordination.
The council discussed various community initiatives and updates, including the 'Popsicle Patrol' program, the state of local community gardens, and upcoming street repair and sidewalk maintenance projects. A grant was secured for water infrastructure improvements and a feasibility study. Additionally, reports on transit expansion, staffing changes in public works, and the status of property acquisition for city use were reviewed. The council also received updates on local events and planned upcoming presentations on community diversion programs.
The council workshop featured a presentation from the Junior Ambassadors regarding their annual activities, including a speech contest and community garden project. The Ambassadors also proposed a new outreach program aimed at providing organized activities for children in the park following free lunch sessions. Additionally, the council discussed upcoming reports regarding the sewer system scoping and held a brief session for audience participation before adjournment.
The City Council meeting included a recognition award presentation, the confirmation of a new Public Works Director, and reports from council members and the police department on topics such as infrastructure improvements, trail safety, graffiti cleanup, and community events like the upcoming Juneteenth celebration and bike rodeo. Discussions also covered new housing and parking regulations, peddler licensing issues, the implementation of a new broadcast system for council meetings, and upcoming regional conferences. Public participation focused on inquiries regarding the trail and garbage collection services.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Algona's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge