Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Algona
Schedule A: Resurface asphalt on three roadway segments - Approx. 725 LF of Second Avenue North; approx. 425 LF of Seattle Boulevard; and approx. 800 LF of Third Avenue North. Schedule B: Remove and replace approx. 570 LF of 8" PVC sanitary sewer line. Improvements include temp pumping of sanitary sewer, trench patching, removal and reconstruction of limited pavement areas, pavement planing, pavement markings, and traffic control.
Posted Date
Apr 30, 2026
Due Date
May 14, 2026
Release: Apr 30, 2026
City of Algona
Close: May 14, 2026
Schedule A: Resurface asphalt on three roadway segments - Approx. 725 LF of Second Avenue North; approx. 425 LF of Seattle Boulevard; and approx. 800 LF of Third Avenue North. Schedule B: Remove and replace approx. 570 LF of 8" PVC sanitary sewer line. Improvements include temp pumping of sanitary sewer, trench patching, removal and reconstruction of limited pavement areas, pavement planing, pavement markings, and traffic control.
City of Algona
Construction of non-motorized improvements along Algona Boulevard from Boundary Boulevard, south approx 7,150 feet to 5th Avenue. Improvements include, but are not limited to, extruded curb, cement concrete sidewalk, isolated asphalt pavement repair areas, pavement markings, traffic control, and other miscellaneous items. Includes 280 LF Removal of Curb and Gutter; 50 SY Removal of Cement Concrete Flatwork; 8 EA Drainage Cut for Existing Curb; 100 TN Crushed Surfacing Top Course; 200 LF Crack Sealing Bit. Pvmt., 1/4 Inch to 1 Inch (5-03.5); 42 TN HMA for Pavement Repair Cl. 1/2" PG 58H-22 (5-04.5); 4,650 LF Extruded Cement Concrete Curb (8-04.5); 360 LF Painted Crosshatch Marking (8-22.5).
Posted Date
Sep 19, 2025
Due Date
Oct 6, 2025
Release: Sep 19, 2025
City of Algona
Close: Oct 6, 2025
Construction of non-motorized improvements along Algona Boulevard from Boundary Boulevard, south approx 7,150 feet to 5th Avenue. Improvements include, but are not limited to, extruded curb, cement concrete sidewalk, isolated asphalt pavement repair areas, pavement markings, traffic control, and other miscellaneous items. Includes 280 LF Removal of Curb and Gutter; 50 SY Removal of Cement Concrete Flatwork; 8 EA Drainage Cut for Existing Curb; 100 TN Crushed Surfacing Top Course; 200 LF Crack Sealing Bit. Pvmt., 1/4 Inch to 1 Inch (5-03.5); 42 TN HMA for Pavement Repair Cl. 1/2" PG 58H-22 (5-04.5); 4,650 LF Extruded Cement Concrete Curb (8-04.5); 360 LF Painted Crosshatch Marking (8-22.5).
City of Algona
Work includes removal and reconstruction of limited pavement areas, pavement planing, asphalt paving, replacement of curb ramps, traffic signal loop replacement, pedestrian push button modifications, pavement marking and traffic control.
Posted Date
Jun 14, 2024
Due Date
Jun 27, 2024
Release: Jun 14, 2024
City of Algona
Close: Jun 27, 2024
Work includes removal and reconstruction of limited pavement areas, pavement planing, asphalt paving, replacement of curb ramps, traffic signal loop replacement, pedestrian push button modifications, pavement marking and traffic control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $10,000, use sole source.
Coops: Start with a cooperative contract (OMNIA Partners, TIPS-USA for the library, or Washington State DES). Ask Finance to confirm piggybacking via interlocal and proceed.
City of Algona, WA
Threshold/context: Very low $10,000 ceiling; no observed sole source awards.
Board meetings and strategic plans from City of Algona
The council workshop featured a presentation from the Junior Ambassadors regarding their annual activities, including a speech contest and community garden project. The Ambassadors also proposed a new outreach program aimed at providing organized activities for children in the park following free lunch sessions. Additionally, the council discussed upcoming reports regarding the sewer system scoping and held a brief session for audience participation before adjournment.
The City Council meeting included a recognition award presentation, the confirmation of a new Public Works Director, and reports from council members and the police department on topics such as infrastructure improvements, trail safety, graffiti cleanup, and community events like the upcoming Juneteenth celebration and bike rodeo. Discussions also covered new housing and parking regulations, peddler licensing issues, the implementation of a new broadcast system for council meetings, and upcoming regional conferences. Public participation focused on inquiries regarding the trail and garbage collection services.
The council discussed various operational items, including the addition of an RW Scott discussion, updates from junior ambassadors, and progress on regional projects such as the new fire office building. Infrastructure and public works topics included addressing standing water on Second Avenue South, sidewalk repairs, trimming trees near stop signs, and addressing unlicensed door-to-door activities. The police department reported a significant reduction in court costs, an update on emergency management and FEMA flood recovery reimbursements, and police staffing updates, including the hiring of a records specialist and facility upgrades. Future planning initiatives include the upcoming bike rodeo, sewer contract discussions with the City of Pacific, and progress updates on the Algora Boulevard walking and bike trail and fiber optic installations.
The council held a shop meeting to discuss city operations, including updates on dispatch services and community engagements related to local events.
The council received an update regarding the fiber installation project in the Pacific Northwest, specifically addressing infrastructure strikes, construction schedules, and restoration efforts for soft and hard surfaces. Council members and the public raised concerns about the lack of a clear construction schedule, poor restoration quality, and safety issues involving exposed conduit and potholes. The fiber project representative committed to improving communication, providing daily street sheets, and coordinating more effectively with city public works to minimize disruptions and improve restoration standards.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Algona's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge