Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Algona
Schedule A: Resurface asphalt on three roadway segments - Approx. 725 LF of Second Avenue North; approx. 425 LF of Seattle Boulevard; and approx. 800 LF of Third Avenue North. Schedule B: Remove and replace approx. 570 LF of 8" PVC sanitary sewer line. Improvements include temp pumping of sanitary sewer, trench patching, removal and reconstruction of limited pavement areas, pavement planing, pavement markings, and traffic control.
Posted Date
Apr 30, 2026
Due Date
May 14, 2026
Release: Apr 30, 2026
City of Algona
Close: May 14, 2026
Schedule A: Resurface asphalt on three roadway segments - Approx. 725 LF of Second Avenue North; approx. 425 LF of Seattle Boulevard; and approx. 800 LF of Third Avenue North. Schedule B: Remove and replace approx. 570 LF of 8" PVC sanitary sewer line. Improvements include temp pumping of sanitary sewer, trench patching, removal and reconstruction of limited pavement areas, pavement planing, pavement markings, and traffic control.
City of Algona
Construction of non-motorized improvements along Algona Boulevard from Boundary Boulevard, south approx 7,150 feet to 5th Avenue. Improvements include, but are not limited to, extruded curb, cement concrete sidewalk, isolated asphalt pavement repair areas, pavement markings, traffic control, and other miscellaneous items. Includes 280 LF Removal of Curb and Gutter; 50 SY Removal of Cement Concrete Flatwork; 8 EA Drainage Cut for Existing Curb; 100 TN Crushed Surfacing Top Course; 200 LF Crack Sealing Bit. Pvmt., 1/4 Inch to 1 Inch (5-03.5); 42 TN HMA for Pavement Repair Cl. 1/2" PG 58H-22 (5-04.5); 4,650 LF Extruded Cement Concrete Curb (8-04.5); 360 LF Painted Crosshatch Marking (8-22.5).
Posted Date
Sep 19, 2025
Due Date
Oct 6, 2025
Release: Sep 19, 2025
City of Algona
Close: Oct 6, 2025
Construction of non-motorized improvements along Algona Boulevard from Boundary Boulevard, south approx 7,150 feet to 5th Avenue. Improvements include, but are not limited to, extruded curb, cement concrete sidewalk, isolated asphalt pavement repair areas, pavement markings, traffic control, and other miscellaneous items. Includes 280 LF Removal of Curb and Gutter; 50 SY Removal of Cement Concrete Flatwork; 8 EA Drainage Cut for Existing Curb; 100 TN Crushed Surfacing Top Course; 200 LF Crack Sealing Bit. Pvmt., 1/4 Inch to 1 Inch (5-03.5); 42 TN HMA for Pavement Repair Cl. 1/2" PG 58H-22 (5-04.5); 4,650 LF Extruded Cement Concrete Curb (8-04.5); 360 LF Painted Crosshatch Marking (8-22.5).
City of Algona
Work includes removal and reconstruction of limited pavement areas, pavement planing, asphalt paving, replacement of curb ramps, traffic signal loop replacement, pedestrian push button modifications, pavement marking and traffic control.
Posted Date
Jun 14, 2024
Due Date
Jun 27, 2024
Release: Jun 14, 2024
City of Algona
Close: Jun 27, 2024
Work includes removal and reconstruction of limited pavement areas, pavement planing, asphalt paving, replacement of curb ramps, traffic signal loop replacement, pedestrian push button modifications, pavement marking and traffic control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $10,000, use sole source.
Coops: Start with a cooperative contract (OMNIA Partners, TIPS-USA for the library, or Washington State DES). Ask Finance to confirm piggybacking via interlocal and proceed.
City of Algona, WA
Threshold/context: Very low $10,000 ceiling; no observed sole source awards.
Board meetings and strategic plans from City of Algona
The council discussed updates on various city projects including the wetland preserve, sewer system CCTV work, street light wiring, and drainage ditch repairs. The police department reported on call statistics, efforts to recover court costs, and the implementation of a new in-car secure router system. Community engagement initiatives like the 'Popsicle Patrol' and the 'Get Active, Stay Active' color run were highlighted. Additionally, the council reviewed a resolution to re-establish the Community Center Advisory Board and discussed potential future grant applications and public safety funding options.
The City Council workshop focused on two primary topics: temporary traffic mitigation strategies and the potential establishment of a code enforcement board. Regarding traffic mitigation, the Council discussed temporary four-way stops at specific intersections on Algona Boulevard to deter traffic during the West Valley Highway closure. For code enforcement, the Council reviewed the concept of a community-led three-person panel to adjudicate code violations, aiming to move away from purely police-based enforcement and empower community involvement.
The City Council meeting included a public hearing regarding a six-year transportation improvement plan. Department reports covered public works maintenance, including ditch clearing and upcoming water main replacement projects, as well as the implementation of permanent pothole repairs and the use of a new striping machine. The Police Department provided updates on field training for new officers, regional efforts to address street racing, preparations for National Night Out, and the acquisition of a new patrol vehicle. Additionally, the Council discussed potential updates to the city code, regional waste and recycling efforts, and municipal transit stops.
The Council meeting involved the presentation of the Blue Heron award for service on the Planning Commission and the formal confirmation of a new Planning Commissioner. Updates were provided regarding the new city website, ongoing public works projects including ditch cleanouts and a wetlands project, and public safety issues such as a recent large party and the renegotiation of an IT services contract. Additionally, the Council discussed the 2025 budget process, including revenue estimates for the general and street funds, and reviewed proposals for updated street lighting standards.
The council meeting included the swearing-in of a new police officer, the presentation of the Blue Heron Award, and various department updates. Key topics discussed were progress on a wetland project, infrastructure maintenance, ongoing rate studies for storm water and sewer services, and grant applications for community projects. Additionally, the police department reported on call statistics from the holiday weekend, vehicle equipment upgrades, and efforts to address local property crimes.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Algona's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge