WWTP Phase 1B RFP
Posted
Sep 18, 2026
Oct 21, 2026
Project consists of constructing a new UV disinfection system, two pump stations and buildings, a 50 mg lined lagoon, irrigation pivots, chlorination system, dechlorination system, two creek crossings, diesel generators, over 1,000' of yard piping ranging in size from 4" to 30" diameter, controls upgrades and electrical upgrades.

