Work includes 200 SY demolition of asphalt sidewalk; 1 LS demolition of existing landscaping; 1 LS install slip resistant coating; 13,200 SF pressure washing existing phase 1 canopy structure; 7,000 SF repainting existing phase 1 canopy structure; 1 LS pedestrian wayfinding and signage; 1,875 SF pre-engineered fabric column-supported canopy (parking lot a to 2nd curb); 1 EA digital message sign (large overhead gantry display); 8 EA electrical trash can and compactor; 12 EA install cctv complete (fixture, mounting brackets, mounting arm, connections, hardware). See attached file.