CityMN
Posted
Oct 14, 2026
Nov 4, 2026
Skateboard Park Phase 2 RFP
Work includes approx 40 LF of sawing concrete/bituminous pavement; 320 CY excavation - common; 232 LF of 4" PVC pipe sewer; 325 LF of silt fence.
Description: Work includes 200 SY demolition of asphalt sidewalk; 1 LS demolition of existing landscaping; 1 LS install slip resistant coating; 13,200 SF pressure washing existing phase 1 canopy structure; 7,000 SF repainting existing phase 1 canopy structure; 1 LS pedestrian wayfinding and signage; 1,875 SF pre-engineered fabric column-supported canopy (parking lot a to 2nd curb); 1 EA digital message sign (large overhead gantry display); 8 EA electrical trash can and compactor; 12 EA install cctv complete (fixture, mounting brackets, mounting arm, connections, hardware). See attached file.
County · FL, US
Decision makers connected to this RFP from Okaloosa County.
Adjacent opportunities open for bidding right now.
CityMN
Posted
Oct 14, 2026
Nov 4, 2026
Work includes approx 40 LF of sawing concrete/bituminous pavement; 320 CY excavation - common; 232 LF of 4" PVC pipe sewer; 325 LF of silt fence.
Special DistrictCA
Posted
Sep 1, 2026
Nov 13, 2026
Work includes installation of a multi-stage well pump and 250 horsepower submersible motor capable of delivering not less than 1500 gpm of well water at a total design head of 469.5 feet.
CityWA
Posted
Oct 20, 2026
Nov 17, 2026
The IS4 - Phase 2 project involves construction of a storm sewer lift station consisting of a concrete cast in place underground vault with three 185 hp submersible Flygt pumps at the NE corner of 92nd Ave/SR 532 intersection in the City of Stanwood. Discharge from the pumps will be through a 24" diameter restrained joint DI force main that will couple with a fusion welded 24" diameter HDPE pipe just south of SR 532 and connecting to the existing outfall. The 24" discharge force main will be "sleeved" through the existing 36" CMP drainage discharge pipe under SR 532, so an open cut across the state highway to install the discharge force main will not be needed. Included in the station will be all electrical equipment including an electrical component FRP enclosure. Electrical equipment shall include but not be limited to VFD starter panels, supply panels, a disconnect for a portable city owned generator and setting of supply power vaults for power serviced. Storm conveyance piping into the pump vault will be large diameter SD pipe with catch basins and a jellyfish filter treatment system. The treatment system will have a flow splitter upstream of treatment to allow for larger flows to bypass the filter. There is a large (72") Corrugated metal storm pipe 14 LF under the sidewalk along the east side of 92nd that will need to be partially removed to allow for the vault to be constructed. With the vault being approx. 24 FT deep and groundwater at 5 FT, dewatering and shoring will be needed. Layback of the trench sides is not an option due to tight site constraints. Coordination with SnoPUD will be required as a few of the power poles are to be relocated.
CityGA
Posted
Oct 25, 2026
Nov 30, 2026
Construct a new concrete basketball court to meet high school court requirements. Court to include concrete slab, new goals and new striping surface.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval