Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Haverhill
Project consists of sand filter underdrain rehabilitation. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of New Prague
Rehabilitation of a steel gravity filter including sand blasting and painting, welding, filter media disposal, new underdrains and nozzles, and new pyrolusite filter media.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
City of New Prague
Close: Dec 16, 2025
Rehabilitation of a steel gravity filter including sand blasting and painting, welding, filter media disposal, new underdrains and nozzles, and new pyrolusite filter media.
AvailableCity of Sunrise
The Work consists of, but not limited to, the rehabilitation of the existing filtration system by replacing the filter underdrain, filter media, launder troughs, air scour delivery system within the underdrain, providing new positive displacement air scour blowers, placement of a crystalline coating system to address leaks in the concrete structure, and the addition of piping within the filter influent flume and other identified surfaces. New chemical injection points and piping will be provided at the clearwell. Other rehabilitation replacements include providing new valves and electric actuators to replace existing. The Human Machine Interface (HMI) on the existing filter control panel, electrical panels within the electrical room, turbidity instruments, filter box level indicators, and pressure head monitoring are to be replaced as well. Within the blower and electrical room, the doors shall be replaced and include landing pads to address existing drainage related sloping issues. All work is to be constructed in accordance with the Drawings and Specifications.
Posted Date
Oct 27, 2025
Due Date
Nov 26, 2025
Release: Oct 27, 2025
City of Sunrise
Close: Nov 26, 2025
The Work consists of, but not limited to, the rehabilitation of the existing filtration system by replacing the filter underdrain, filter media, launder troughs, air scour delivery system within the underdrain, providing new positive displacement air scour blowers, placement of a crystalline coating system to address leaks in the concrete structure, and the addition of piping within the filter influent flume and other identified surfaces. New chemical injection points and piping will be provided at the clearwell. Other rehabilitation replacements include providing new valves and electric actuators to replace existing. The Human Machine Interface (HMI) on the existing filter control panel, electrical panels within the electrical room, turbidity instruments, filter box level indicators, and pressure head monitoring are to be replaced as well. Within the blower and electrical room, the doors shall be replaced and include landing pads to address existing drainage related sloping issues. All work is to be constructed in accordance with the Drawings and Specifications.
AvailableTown of Danvers
Removing, stockpiling and disposing of 70 CYof sand filter media from sand filter 1 & 2, chemical cleaning of the existing water treatment plant sand filter beds suing pantonite pm77
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
Town of Danvers
Close: Dec 4, 2025
Removing, stockpiling and disposing of 70 CYof sand filter media from sand filter 1 & 2, chemical cleaning of the existing water treatment plant sand filter beds suing pantonite pm77
AvailableCity of Fort Wayne
Provide a turn-key solution to remove and replace the existing sand filter system.
Posted Date
Nov 13, 2025
Due Date
Dec 4, 2025
Release: Nov 13, 2025
City of Fort Wayne
Close: Dec 4, 2025
Provide a turn-key solution to remove and replace the existing sand filter system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis