Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will consist of the construction of three new dual-bed twocell gravity filters equipped with media and leopold type xa underdrain systems. Other contruction will include: new filter effluent, backwash, and rewash pipes installed in the filter building pipe gallery; new air scour piping to support new filters; civil improvements associated with new wash water main serving new filters discharging into existing circular gravity thickener; new asphalt roadway to filters and retacking existing asphalt roadways; improving exterior concrete stairs; relocating hvac condensing unit and refrigerant lines; demolition of supply fans in the high service pump building and ancillary electrical and instrumentation improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of wtp filter and sedimentation upgrades. See outside link.
Posted Date
Dec 25, 2025
Due Date
Jan 20, 2026
Release: Dec 25, 2025
Close: Jan 20, 2026
Project consists of wtp filter and sedimentation upgrades. See outside link.
AvailableConstruction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Close: Feb 19, 2026
Construction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
Work consist of rehab and replace filter underdrains and media.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Work consist of rehab and replace filter underdrains and media.
AvailableThis RFP is for the demolition of existing filter control building components, filter valves, operators, electrical conduit, wiring, PLC, and SCADA systems, and the installation of new filter control building, UPS shed, filter valves, bridge crane system, PLC, UPS, and SCADA systems, alongside extensive electrical modifications at the Reservoir 1 Water Treatment Plant.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
This RFP is for the demolition of existing filter control building components, filter valves, operators, electrical conduit, wiring, PLC, and SCADA systems, and the installation of new filter control building, UPS shed, filter valves, bridge crane system, PLC, UPS, and SCADA systems, alongside extensive electrical modifications at the Reservoir 1 Water Treatment Plant.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis