Traffic Signal Detection Loop Assembly Installation
Posted
Sep 10, 2026
Oct 20, 2026
Work includes 10 EA signal loop repair (type b) 6' x 6' cut, furnish and install, each loop; 20 EA signal loop repair (type a) 6'x 20' cut, furnish and install, each loop; 20 EA signal loop repair (type a) 6' x 50' cut, furnish and install, each loop; 20 EA signal loop repair (type f) 6' x 50' cut, furnish and install, each loop; 1,000 LF furnish and install lead-in from pull box to controller assembly; 10 EA drill 2" loop window under curb and furnish and install 2" conduit to existing pull box; 10 EA drill 2" loop window under curb and furnish and install 2" conduit and add new pull box. See attached file.
