Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Dracut Water Suppy District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Treasurer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Dracut Water Suppy District
Construction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Dracut Water Suppy District
Close: Feb 19, 2026
Construction of a new 2.65 MGD PFAS WTP housing PFAS filter vessels at the Tyngsborough Wellfield WTP site. The new PFAS WTP building will be approx. 4,100 SF constructed of masonry walls, wood roof trusses, an asphalt shingle roof, block veneer, and is inclusive of process, HVAC, plumbing, electrical, instrumentation, and SCADA; Modified and new site piping, site work for drainage, water, sewer, gas, electrical and all site/civil surface finishes; replacement of existing booster pumps, motors, VFDs, wiring, and associated piping work at
AvailableDracut Water Suppy District
Consists of construction of a 2.65 MGD PFAS Water Treatment Plant in a new approx. 5,000 SF building constructed of masonry walls, wood roof trusses, an asphalt shingle roof, and block veneer. The work includes, but is not limited to, site work, drainage infrastructure, process piping, process equipment, HVAC, plumbing, electrical, instrumentation, and SCADA.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
Dracut Water Suppy District
Close: Nov 20, 2025
Consists of construction of a 2.65 MGD PFAS Water Treatment Plant in a new approx. 5,000 SF building constructed of masonry walls, wood roof trusses, an asphalt shingle roof, and block veneer. The work includes, but is not limited to, site work, drainage infrastructure, process piping, process equipment, HVAC, plumbing, electrical, instrumentation, and SCADA.
Dracut Water Suppy District
Work consists of installation of one 18x24 glass-bead, packed replacement well.
Posted Date
May 15, 2025
Due Date
May 29, 2025
Release: May 15, 2025
Dracut Water Suppy District
Close: May 29, 2025
Work consists of installation of one 18x24 glass-bead, packed replacement well.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.