Virginia Beach City Public Schools
School DistrictVA
Posted
Nov 2, 2026
Nov 24, 2026
Description: Winnebago County solicits sealed bids to remove and replace the Wittman Airport control tower’s chiller, including all labor, equipment and materials required to meet the technical specifications. A mandatory pre-bid meeting was held on November 18, 2025 at Gate #33 (3110 Knapp St, Oshkosh, WI), and bids must be submitted electronically through the County’s OpenGov procurement portal. Bid security (5% bid bond), insurance per the County’s Insurance Exhibit, and a Public Improvement Performance/Labor & Material Payment Bond are required; the solicitation includes drawings, specifications, and addenda posted on the project page.
County · WI, US
Decision makers connected to this RFP from Winnebago County.
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
157 days before RFP
The County's June 2025 master plan recorded a need to replace aging mechanical equipment while developing options for a 20-year campus modernization plan.
AVENTURF June 2025 ARCHITECTSw Project No. 240077 .00 Winnebago County, WI Master Plan Page 3 of 53 HISTORY Winnebago County is home to four cities and parts of another, 15 towns, two villages and eight unincorporated communities spread across 579 square miles, with 171,730 residents as of the 2020 census. The departments discussed in this report are…
Winnebago County Master Plan 2025
Capital improvement plan · Jun 1, 2025
RFP published
Proposals due (26 days left)
Adjacent opportunities open for bidding right now.
Virginia Beach City Public Schools
School DistrictVA
Posted
Nov 2, 2026
Nov 24, 2026
Provide chiller and cooling tower replacement. The renovations will include the replacement of the two (2) chiller units, and two (2) chiller towers. The work will also include replacing various valves on air handling units (AHUs) in the building. Typical building construction consist of a slab-on-grade foundation, brick exterior walls, and an asphalt flat roof. Interior finishes include vinyl floor tile, concrete masonry unit (CMU) walls, suspended acoustical ceiling tile and plaster ceilings.
Howard County Public School System
School DistrictMD
Posted
Oct 28, 2026
Dec 3, 2026
Harper's choice middle school chiller & cooling tower replacement.
Wisconsin Department of Administration
State AgencyWI
Posted
-
Jan 12, 2027
Work consists of removing two water cooled chillers, associated cooling towers, pumps, chemical treatment equipment, piping and controls. Construction of a new chilled water system consists of the following features: two new 160-ton outdoor air cooled chillers with on-board dual primary chilled water pumps, two new indoor secondary pumps with VFDs, new controls, new piping specialties, and new associated chilled water piping.
Higher EducationGA
Posted
Nov 4, 2026
Dec 3, 2026
Gordon State College is seeking bids from qualified contractors for the Chiller replacement at Lambdin Hall on GSC campus. Please see attached Invitation to Bid for more information. A mandatory pre-bid meeting will be held at the Facilities conference room, 419 College Dr. Barnesvillle, GA on Thursday, November 12, 2026, at 10:00 am. All contractors interested in submitting a bid must have a representative at this meeting. GSC Facilities building conference room is located in building number 5 on the attached campus map.