Roof Replacement - Pray-Sims Hall RFP
Posted
Nov 19, 2026
Jan 7, 2027
Work consists of: remove and dispose of existing gravel surfaced built-up roofing systems down to the existing asphaltic vapor retarder / concrete deck. Provide self-adhered vapor, r-30 average insulation system, and fully adhered 60-mil epdm single ply membrane. Provide perimeter free standing guard rail system and prefinished sheet metal flashings.




