FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) RFP
Domestic water, chilled water and steam piping.
Description: Work consists of: providing new steam tunnel connections for Schneider hall and the student welcome center and select site utilities relocations in preparation for the demolition of the phillips hall annex. Provide temporary steam to both Schneider hall and the student welcome center for the interim in which the campus steam loop is disconnected from those facilities.
StateAgency · WI, US
Adjacent opportunities open for bidding right now.
Posted
Sep 18, 2026
Dec 2, 2026
Domestic water, chilled water and steam piping.
Higher EducationON
Posted
Nov 20, 2026
Dec 15, 2026
This Request for Proposal ("RFP") is an invitation to prospective Respondents to submit Responses for the provision of Chilled Water and Plumbing Piping Replacement as further described in RFP 2026-P-08- Attachment 1 - Detailed Scope and Requirements Please note there is a MANDATORY site visit. See posting for details.
Tennessee Technological University
Higher EducationTN
Posted
-
Dec 2, 2026
Relocate and replace Columbia Grounds Storage Building on the Columbia Campus. To include the demolition of existing structure and replacement with equivalent structure in new location on the campus.
St Charles County Public Water Supply District 2
Special DistrictMO
Posted
Nov 2, 2026
Dec 10, 2026
The scope of work for the project includes relocation of water mains. The relocation includes approximately 415 LF of 12" pvc water line, 71 LF of 12" restrained ductile water line for an open cut roadway crossing, and a separate fire hydrant relocation on the existing main.
Decision makers connected to this RFP from Wisconsin Department of Administration.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
677 days before RFP
The State Building Commission approved $7,825,000 SEG REV for preliminary plans and specifications for Science/Health Science Building Phase II and Philips Hall Demolition.
In October 2023, the SBC approved $7,825,000 SEG REV to develop preliminary plans and specifications for Science/Health Science Building Phase II & Philips Hall Demolition.
State Of Wisconsin Building Commission
Board meeting · Jan 10, 2025
RFP published
Proposals due (45 days left)