Humbolt Pacific Crest Trail Bridge Replacement RFP
The existing bridge shall be removed and disposed of entirely, off federal lands. It is a steel and timber bridge consisting of (4) 33-FT long, 24" deep h9 open-web steel joists, steel framing and railing posts, and timber decking and railing. The timber sills sit on bedrock. The new bridge shall be a 6-FT by 35-FT glulam deck panel bridge with timber railing. Existing approaches will be reconstructed to match plans and new grade of bridge, and approach railing shall be installed. New timber sills will sit directly on bedrock and a concrete levelling course. The east approach will require bedrock removal for proper elevation and a suitable seat for the sill.