Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Junction City, KS issued a solicitation for maintenance and improvement construction work on Westwood Boulevard including resurfacing, pavement repair, and drainage enhancements. Bidders are instructed to submit sealed bids to the City Clerk’s office at the Municipal Building in Junction City and to review contract documents (noted as available via Kaw Valley Engineering, Inc.). The solicitation was posted on 2025-12-17 and has a response deadline of 2026-01-21.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Arterial street rehabilitation - Pine Street and Martin Luther King Boulevard intersection. Bid items: 304 CY unclassified excavation; 1,232 SY solid slab sodding; 8,758 SY cold mill pavement; 927 SY of 4" conc sidewalk; 25 SY of 4" decorative conc sidewalk; 8 hour traffic signal maintenance. See attached file.
Posted Date
Dec 26, 2025
Due Date
Jan 30, 2026
Release: Dec 26, 2025
Close: Jan 30, 2026
Arterial street rehabilitation - Pine Street and Martin Luther King Boulevard intersection. Bid items: 304 CY unclassified excavation; 1,232 SY solid slab sodding; 8,758 SY cold mill pavement; 927 SY of 4" conc sidewalk; 25 SY of 4" decorative conc sidewalk; 8 hour traffic signal maintenance. See attached file.
AvailableProject consists of constructing two (2) new sewer manholes over existing sewers at the intersection of Westminster Boulevard and Springdale Street, and includes (a) removal of conflicting existing 8" VCP sewer and (b) construction of two (2) 48" diameter PVC Lined Manholes. The project will also require (but not be limited to): protecting existing utilities; coordination with utility owners, shoring, dewatering, maintaining the existing sewer flows during construction, traffic control, pavement resurfacing, slurry seal pavement as required, traffic restriping, replacement of traffic loop detectors and installation of raised pavement markers and appurtenant work.
Posted Date
Nov 21, 2025
Due Date
Jan 20, 2026
Release: Nov 21, 2025
Close: Jan 20, 2026
Project consists of constructing two (2) new sewer manholes over existing sewers at the intersection of Westminster Boulevard and Springdale Street, and includes (a) removal of conflicting existing 8" VCP sewer and (b) construction of two (2) 48" diameter PVC Lined Manholes. The project will also require (but not be limited to): protecting existing utilities; coordination with utility owners, shoring, dewatering, maintaining the existing sewer flows during construction, traffic control, pavement resurfacing, slurry seal pavement as required, traffic restriping, replacement of traffic loop detectors and installation of raised pavement markers and appurtenant work.
Work includes 3 CY unclassified excavation; 3 CY trench backfill slurry (class 270-e-500); 2 TN ac pavement; 1 CY PCC pavement; 20 SF pcc walk, 4" thick; 60 LF 3" conduit (sch 80 PVC); 3,730 LF inductive loop detector and leads saw cut; 46 EA 3-12" LED vehicle head (complete); 1 EA relocate sign; 233 LF 12" striping (thermoplastic); 70 LF pcc curb & gutter; 1 EA 4-camera video/radar detection system (complete); 48 EA sign panel (post).
Posted Date
Dec 2, 2025
Due Date
Jan 22, 2026
Release: Dec 2, 2025
Close: Jan 22, 2026
Work includes 3 CY unclassified excavation; 3 CY trench backfill slurry (class 270-e-500); 2 TN ac pavement; 1 CY PCC pavement; 20 SF pcc walk, 4" thick; 60 LF 3" conduit (sch 80 PVC); 3,730 LF inductive loop detector and leads saw cut; 46 EA 3-12" LED vehicle head (complete); 1 EA relocate sign; 233 LF 12" striping (thermoplastic); 70 LF pcc curb & gutter; 1 EA 4-camera video/radar detection system (complete); 48 EA sign panel (post).
The work includes utility installations for water, wastewater, and electrical infrastructure; storm sewer installations; roadway reconstruction; intelligent transportation system infrastructure; roadway lighting; signing and pavement markings; and landscape.
Posted Date
Nov 9, 2025
Due Date
Jan 15, 2026
Release: Nov 9, 2025
Close: Jan 15, 2026
The work includes utility installations for water, wastewater, and electrical infrastructure; storm sewer installations; roadway reconstruction; intelligent transportation system infrastructure; roadway lighting; signing and pavement markings; and landscape.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis