Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Orlando
The work includes utility installations for water, wastewater, and electrical infrastructure; storm sewer installations; roadway reconstruction; intelligent transportation system infrastructure; roadway lighting; signing and pavement markings; and landscape.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Carson
Work includes new subgrades and geotextile installation, grind and overlay, and includes signing, stripping and streetlights, also including rehabilitation of the county parking lot.
Posted Date
Oct 9, 2025
Due Date
Dec 17, 2025
Release: Oct 9, 2025
City of Carson
Close: Dec 17, 2025
Work includes new subgrades and geotextile installation, grind and overlay, and includes signing, stripping and streetlights, also including rehabilitation of the county parking lot.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Long Beach
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
City of Long Beach
Close: Dec 18, 2025
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
AvailableCity of Columbus
Project involves the improvement of approximately 0.32 miles of blossom field boulevard, between east broad street and westbourne avenue, by resurfacing and pavement removal. In addition to this work will be the placement of a roundabout at the intersection of blossom field boulevard/granite pointe drive/westbourne avenue. The improvements also include new, full depth pavement, curb and gutter, straight curb, sidewalk, drives, storm sewer system, bioretention cell, shared use path, signage, lighting, and other such work.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
City of Columbus
Close: Dec 4, 2025
Project involves the improvement of approximately 0.32 miles of blossom field boulevard, between east broad street and westbourne avenue, by resurfacing and pavement removal. In addition to this work will be the placement of a roundabout at the intersection of blossom field boulevard/granite pointe drive/westbourne avenue. The improvements also include new, full depth pavement, curb and gutter, straight curb, sidewalk, drives, storm sewer system, bioretention cell, shared use path, signage, lighting, and other such work.
Town of West Jefferson
Street stormwater improvements.
Posted Date
Nov 12, 2025
Due Date
Dec 5, 2025
Release: Nov 12, 2025
Town of West Jefferson
Close: Dec 5, 2025
Street stormwater improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →