Retrieving RFP details
Release
Close
City of Long Beach
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
City of Virginia Beach
Work includes construction of pedestrian facilities. Improvements include ada compliant curb ramps, extension of sidewalk, pedestrian crosswalks, led pedestrian warning signs, and rapid rectangular flashing beacon (rrfb). 233 SY demolition of pavement flexible; 496 SY remove sidewalk and entrance; 706 LF remove comb curb and gutter; 8 CY regular excavation; 370 SY curb ramp with detectable warning surface, cast-in-place; 3 CY retaining wall rw-3; 3 EA breakaway wood bollard. See attached file.
County of Kern
Work consists of constructing curb and gutter, sidewalk, drive approaches, driveways, and curb ramps, paving hot mix asphalt, installing roadside signs, installing handrails, installing fences and gates, relocating mailboxes and roadside signs, reconstructing fences, gates, and block walls, resetting gates, removing pedestrian head, replacing existing section 3 ball head with 4 section head, removing existing 3 section arrow head, removing traffic stripes and thermoplastic pavement markings, and applying thermoplastic traffic stripes and pavement markings.
City of Manteca
Work consists of bike and pedestrian improvement project, work includes the installation of rectangular rapid flashing beacons, bike lanes, curb ramps, and pedestrian crossing enhancements, slurry seal, striping, pavement markings, and signage.
Release
Oct 30, 2025
Close
Dec 18, 2025