Bollman Water Treatment Plant Improvements RFP
Water treatment plant improvements.
Description: Construction of a powdered activated carbon storage silo and screw conveyor feed system, silo foundation, and sludge lagoon overflow monitoring instrumentation at the Wes Brown Water Treatment Plant.
City · CO, US
Decision makers connected to this RFP from City of Thornton.
From the first pre-RFP signals to the published RFP and its files.
Budget
Thornton's FY2026 Budget lists a $2,482,282 appropriation for WBWTP PAC Facility Improvements.
Water Treatment Projects 2026 Appropriation Project Description Estimated Ongoing Operating Costs PFAS Treatment $70,077,569 This project will provide for Granular Activated Car- bon (GAC) treatment at the Thornton Water Treat- ment Plant to treat PFAS. $860,000 per year in GAC material. WBWTP PAC Facility Improvements 2,482,282
City of Thornton FY2026 Budget
Budget · 2025
PFAS Treatment 70,077,569$ -$ -$ -$ -$ 70,077,569$ WBWTP PAC Facility Improvements 2,482,282 - - - - 2,482,282 Sludge Disposal Improvements 1,946,152 2,015,241 2,086,782 2,160,863 2,237,573 10,446,611
City of Thornton FY2026 Proposed Budget
Proposed budget · Jul 1, 2025
RFP published
Proposals due (12 days left)
Adjacent opportunities open for bidding right now.
Special DistrictCA
Posted
Oct 29, 2026
Dec 10, 2026
Water treatment plant improvements.
CityCT
Posted
Nov 18, 2026
Dec 9, 2026
Electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant, including replacement of the fixed-speed system with variable frequency drives (VFDs) and upgrades to electrical distribution infrastructure.
CityOK
Posted
Oct 14, 2026
Dec 2, 2026
Scope consists of 1 LS chemical system improvements; 9 EA 36" motorized actuator; 3 EA 60" motorized actuator; 4 EA 36" butterfly valve, mj.
CityOK
Posted
Nov 11, 2026
Dec 30, 2026
Construct a new 5-million-gallon clearwell and associated water-treatment infrastructure. The work includes an 84-inch pipeline and related piping, gate and control structures, disinfection polishing buildings, chemical-feed improvements, electrical and instrumentation and control systems, site work, and modifications to existing plant infrastructure.