Division A: Water Treatment Plant
The work consists of a new 300 gallon per minute treatment plant with filtration systems, chemical feed systems, pumps, controls, site piping, and building. Work will also include upgrades to the electrical systems and the addition of a generator at the well field. The work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents.
Division B: Route 130 Water Main Extension
The work consists of furnishing and installing water piping, fittings, valves, hydrants, services, connections, disconnections, and appurtenances for potable water. Installation will consist of 6” PVC RJ Yelomine HDD and 6” PVC SDR-21 Water Main along design route. This work also includes surface restoration. The work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents.