CityIL
Posted
Sep 29, 2026
Oct 13, 2026
2026 Edwards Avenue Storm Sewer Repair
Storm sewer repair.
Description: Project consists of removal of a collapsed storm sewer and replacement with reinforced concrete pipe, with surface repairs and ancillary work required.
City · IA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityIL
Posted
Sep 29, 2026
Oct 13, 2026
Storm sewer repair.
Special DistrictMO
Posted
-
Oct 22, 2026
Work to be done under this contract consists of the construction of approximately 1,489 lineal feet of storm pipe sewers, varying in size from 6-inch to 48-inch diameter, 103 lineal feet of pipe in tunnel, 380 lineal feet of bank stabilization, one stream grade control, and appurtenances.
CityOH
Posted
Jul 1, 2026
Oct 15, 2026
This project consists of replacing approximately 500 feet of combined main sewer on Myron Avenue between East 71 Street and East 74 Street.
Minnesota State University Mankato
Higher EducationMN
Posted
Oct 1, 2026
Oct 22, 2026
Works include approx. 1,890 CY common excavation (EV) (P); 850 LF of silt fence, type MS; 267 LF of 18" storm sewer; 7 EA storm sewer casting assembly.
Decision makers connected to this RFP from City of Vinton.