Vinton - 3rd Avenue Storm Sewer Repair RFP
Project consists of removal of a collapsed storm sewer and replacement with reinforced concrete pipe, with surface repairs and ancillary work required.
Description: Storm sewer repair.
City · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Village of West Dundee.
Adjacent opportunities open for bidding right now.
CityIA
Posted
Sep 29, 2026
Oct 16, 2026
Project consists of removal of a collapsed storm sewer and replacement with reinforced concrete pipe, with surface repairs and ancillary work required.
Special DistrictMO
Posted
-
Oct 22, 2026
Work to be done under this contract consists of the construction of approximately 1,489 lineal feet of storm pipe sewers, varying in size from 6-inch to 48-inch diameter, 103 lineal feet of pipe in tunnel, 380 lineal feet of bank stabilization, one stream grade control, and appurtenances.
CityPA
Posted
-
Oct 21, 2026
Contract A includes approx 3,460 LF of 8" cure-in-place mainline lining applying ultraviolet light. Contract B includes approx 125 VF full depth epoxy manhole lining. Contract C includes approx 1,040 LF of storm sewer line cleaning; 1,040 LF of pre-lining closed circuit television inspection; 850 LF of 18" cured-in-place storm sewer pipe lining.
Minneapolis-St Paul Metropolitan Airports Commission
Special DistrictMN
Posted
Sep 28, 2026
Oct 13, 2026
Replacement of sanitary sewer on both landside and airside. This work includes mobilization, maintenance of traffic and traffic control, removals, temporary shoring, sanitary sewer construction via open cut and trenchless guided auger boring, plant mixed asphalt pavement, concrete pavement, concrete curb and gutter, and pavement markings.