FederalCA
Posted
Aug 24, 2026
Sep 11, 2026
Hvac Replacement At Usgs/wfrc Freezer Room In Seat
Requires replacement of the undersized variable air volume (VAV) box and associated ductwork serving Room D109, the facility freezer room, and installation of a properly sized VAV box, supply ductwork, supply diffusers, and return grilles to provide adequate cooling capacity for the thermal load generated by the room's freezer inventory.