Oklahoma Department of Transportation
State AgencyOK
Posted
Apr 29, 2020
Sep 17, 2026
810, 34367(04), NHPP-023N(003)FP - Bridge Rehabilitation
Approx. 1 LS Clearing and grubbing; 381 CY unclassified excavation; 1,500 SY solid slab sodding; 1,612.500 LF beam guardrail W-beam single; 4 ea guardrail end treatment (31"); 4 EA guardrail bridge conn-thrie beam (31"); 2,143.900 SY saw-cut grooving; 8,600 LF pavement mrkng. Removal(traf. strp); 480 SD port. changeable message sign. Project length = 0.087 m. See attached file and outside link.