S-I15-1(143)17 - I-15; SB Passing Lane MP 15.0 to 20.3 - New Capacity RFP
-
Closes
Aug 25, 2026
Work includes 1 LS of mobilization; 3 EA of reconstruct manhole - raise; 97,822 SY of geogrid; 1 EA of remove catch basin; 8 EA of remove tree; 2 EA of remove concrete headwall 61" - 84" pipe; 6,974 FT of remove guardrail; 86 ft of remove fence; 20 EA of remove pipe end section; 3,192 FT of remove precast concrete barrier; 174,077 CY of roadway excavation; 1,726 CY of loose riprap; 4 CY of compacted riprap; 3,571 SY of turf reinforcement mat; 300 ft of drainage pipe - 24", metal, silt-tight; 3 EA of circular end section 18"; 1 EA of 4 FT standard manhole 11 ft to 13 ft deep - cb 11; 50,936 CY of untreated base course; 51,577 TN of hmhma - 1/2"; 110 cy of asphalt pavement soft spot repair - contingency item; etc, see attached file.
