Oklahoma Department of Transportation
State AgencyOK
Posted
-
Sep 10, 2026
780, 31961(04), NHPP-015N(039)PM - Bridge Rehabilitation
Approx. 1,612 SY Saw-cut grooving; 1,600 LB structural steel; 1 LS painting existing structures; 30 SF sheet aluminum signs; 300 LF pavement marking removal (hydroblasting); 37.500 LF beam guardrail W-beam single; 3 EA roadway luminaire; 6 EA underpass luminaire project length = 0.051 mi. See attached file and outside link.