Bridge Replacement Newcomb Rd Bridge over Canisteo River RFP
Work consist of 1,758 cy of structure excavation, 295 cy of trench and culvert excavation, 251 sy of prefabricated composite integral abutment drain, 1,530 seed and mulch - temporary, 450 lf of silt fence - temporary, 830 lf of turbidity curtain - temporary, 2,814 lf of steel h-piles, 23 sy of miscellaneous cold milling of bituminous concrete, 350 lf of asphalt pavement joint adhesive, 82 ea of splices for steel h-piles, 1,740 lf of steel h-piles, 57,901 lb of epoxy-coated bar reinforcement for structures, 2,628 ea of stud shear connectors for bridges, 7,860 sf of protective sealing of structural concrete on new bridge decks and bridge deck overlays. See attached file.