CountyKS
Posted
Oct 26, 2026
Dec 2, 2026
Bridge Rehabilitation - NW Maple Hill Road Bridge Over Kansas River / BSN 590 RFP
Bridge rehabilitation project includes 1 LS Mobilization, 1 LS Removal of Existing Structures; 169 CY Unclassified Excavation; 80 SY Concrete Pavement (10” Unif.)(AE); 325 LF Guardrail, Steel Plate (MGS); 514 SY 9” Asphaltic Concrete Pavement.
