Special DistrictCA
Posted
Oct 22, 2026
Nov 23, 2026
STREET RECONSTRUCTION PROJECT - ZONE G PHASES 3 & 4 RFP
Street reconstruction and pavement rehabilitation, including curb ramp upgrades, curb extensions, and installation of a fire hydrant.
Description: The solicitation seeks installation of HUD Severe Use kitchen cabinets with countertops. It calls for wall and base cabinets with specific finish requirements. The installation must comply with ADA standards.
SpecialDistrict · NC, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Winston-Salem Housing Authority.
Adjacent opportunities open for bidding right now.
Special DistrictCA
Posted
Oct 22, 2026
Nov 23, 2026
Street reconstruction and pavement rehabilitation, including curb ramp upgrades, curb extensions, and installation of a fire hydrant.
CityCA
Posted
Oct 22, 2026
Nov 23, 2026
Project primarily consists of, but is not limited to, pavement rehabilitation, reconstruction of existing pavement, upgrading curb ramps to current americans with disabilities act (ada) standards, constructing curb extensions, and installing a fire hydrant and associated work. Pavement rehabilitation includes grind and overlay and full reconstruction.
CityVA
Posted
Oct 31, 2026
Dec 1, 2026
Includes the base bid construction of approx., 1,230 lf of 6" water line, 650 LF of 4" water line, 855 LF of 2" water line, five (5) gate valves, two (2) blow-off valves, two (2) air release valves, one (1) fire hydrant, ten (10) water meters, and associated appurtenances.
CityIL
Posted
Oct 20, 2026
Nov 19, 2026
The scope of work consists of the installation of approx. 125 lead service line replacements from water main to interior water meter, and all other appurtenant work and materials necessary to complete the project throughout the City. 15 unit tree removal (6-15 unit dia.); 1 Ea asbestos abatement; 5 Ea pothole existing water service at main; 80 Ea water service connection at B-Box- 1"; 2 Ea sanitary sewer service repair; 1,250 SF of 5" PCC sidewalk replacement; 7,500 LF of 1" water service installation, ty K. See outside link.