Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Winston-Salem Housing Authority
Project consist of Fire Unit 2729-2731 Piedmont Cir
Posted Date
Mar 5, 2026
Due Date
Apr 2, 2026
Release: Mar 5, 2026
Winston-Salem Housing Authority
Close: Apr 2, 2026
Project consist of Fire Unit 2729-2731 Piedmont Cir
AvailableWinston-Salem Housing Authority
Project consist of Flooring Replacement.
Posted Date
Mar 3, 2026
Due Date
Mar 31, 2026
Release: Mar 3, 2026
Winston-Salem Housing Authority
Close: Mar 31, 2026
Project consist of Flooring Replacement.
AvailableWinston-Salem Housing Authority
Furnish and install all products and services to complete the high-quality work to modernize the unit kitchens located at Healy Towers (Building Occupied in 1982) located in Winston Salem NC. REID 6814290237000 PIN # 6814-29-0237. This mid-rise building has thirty (30) zero-bedroom efficiency units, seventy-five (75) one-bedroom units for a total of one hundred five (105) units. The building has ten (10) designated handicap units (units C & P on each tenant floor two (2) thru six (6)) The building is completely occupied (elderly disabled) so great care will be taken to protect the tenants and their property to be safe and habitable. To include and not limited to adverse conditions, noise, physical protection, dust control, temporary barriers and negative air pressure if necessary. When building elevators are utilized to transport workers or materials protection will be provided by contractors to always protect finishes and flooring. Work will be completed in a phased approach, such as one floor or one hallway at a time.
Posted Date
Mar 3, 2026
Due Date
Mar 18, 2026
Release: Mar 3, 2026
Winston-Salem Housing Authority
Close: Mar 18, 2026
Furnish and install all products and services to complete the high-quality work to modernize the unit kitchens located at Healy Towers (Building Occupied in 1982) located in Winston Salem NC. REID 6814290237000 PIN # 6814-29-0237. This mid-rise building has thirty (30) zero-bedroom efficiency units, seventy-five (75) one-bedroom units for a total of one hundred five (105) units. The building has ten (10) designated handicap units (units C & P on each tenant floor two (2) thru six (6)) The building is completely occupied (elderly disabled) so great care will be taken to protect the tenants and their property to be safe and habitable. To include and not limited to adverse conditions, noise, physical protection, dust control, temporary barriers and negative air pressure if necessary. When building elevators are utilized to transport workers or materials protection will be provided by contractors to always protect finishes and flooring. Work will be completed in a phased approach, such as one floor or one hallway at a time.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Winston-Salem Housing Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database