CountyGA
Posted
-
Nov 19, 2026
Lake McIntosh Dam Structural Repairs RFP
Structural concrete repairs to the dam spillway structure.
Description: Rehabilitate the existing concrete marginal wharf. Work includes demolition and removal of portions of the existing concrete deck, pile caps, and appurtenances, construction of a new reinforced concrete deck, repair of existing piles, installation of pile jackets, and replacement of waterfront elements, including bull rails, wale systems, fenders, and mooring hardware such as bollards. Work also includes installation and replacement of utilities and site improvements, including potable water, stormwater, drainage, pavement replacement, and utility potholing. Additional work includes excavation, backfill, dewatering, demolition, hauling, disposal, and temporary work necessary to complete the Project.
SpecialDistrict · CA, US
From the first pre-RFP signals to the published RFP and its files.
Budget
The FY2026 budget lists $1,427,200 for Structural Repairs at NCMT Berths 24-3 and 24-4, with $3,310,000 forecast for FY2027 and $10,000,000 in the future budget.
PROJECT NAME TOTAL PROJECT BUDGET FORECAST FUTURE BUDGET FY 2026 FY 2027 BUDGET MAJOR MAINTENANCE CAPITAL PROJECTS TAMT Post Indicator Valve Replacement at Warehouses B & C $ 2,600,000 $ 2,600,000 $ --- $ --- Maintenance Dredging at B St. Cruise Ship Terminal 2,280,000 2,170,000 --- --- Railroad Tie Repairs at TAMT 2,200,000 1,800,000 --- --- Utility Piping…
San Diego Unified Port District FY2026 Budget
Budget · Jun 6, 2025
Budget
The FY2027 Final Budget lists Structural Repairs at NCMT Berth 24-3 and 24-4 with a total project budget of $49,280,000 and FY2027 budget of $889,900.
The following list of Major Maintenance projects for FY 2027 will be implemented in accordance with BPC Policy No. 130 (see Section 5 Appendix). This list represents a 3-year outlook of projects generated through the Asset Management Program (AMP) which uses a scientifically based methodology to determine repairs or replacements of high risk assets before…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (Closed)
San Diego Unified Port District FY2027 Budget
Budget · Jun 23, 2026
Decision makers connected to this RFP from San Diego Unified Port District.
These related opportunities are still open for bidding.
CountyGA
Posted
-
Nov 19, 2026
Structural concrete repairs to the dam spillway structure.
CityNY
Posted
Nov 12, 2026
Dec 7, 2026
The City of White Plains describes this as a major, multi-stage rehabilitation of Chester-Maple Garage addressing façade and structural repairs. Engineering analysis identified Chester-Maple as a garage to prioritize for major repairs, and the municipal garages are maintained by the City's Department of Public Works. The City expected the work to begin in spring 2027.
Daytona Beach Housing Authority
Special DistrictFL
Posted
Sep 27, 2026
Nov 19, 2026
Work includes structural repairs.
Posted
Nov 9, 2026
Dec 15, 2026
Various structural repairs to the Wastewater Treatment Facility, including crack and spall repairs to the concrete roof planks, pipe gallery walls, and clarifier walls; removal, replacement and/or repair of the steel beams and angles located in Pipe Gallery No. 1; repair and replacement of the interior vertical Pipe Gallery wall joints; removal of grating and concrete planks above the aeration pipe troughs; filling of the aeration pipe troughs, removal and pouring of exterior slab expansion joints, re-caulking of slab score lines for architectural treatment; the application of waterproofing coating on the exterior concrete slab; and all other work.