MIA – North Terminal Optimization Envoy Tenant Relocation RFP
Posted
Nov 4, 2026
Dec 15, 2026
Project includes packaged a: miscellaneous general work (GC); packaged b: drywall; package c; acoustical ceilings; package d: flooring/wall tiles; package e: fire sprinklers; package f: plumbing; package g: hvac; package h: electrical.



