Nebraska Department of Transportation
State AgencyNE
Posted
Sep 10, 2026
Oct 1, 2026
22934, CMAQ-28(163) - Signal Infrastructure Phase E2 RFP
Signal infrastructure phase e2.
Description: Signal infrastructure.
StateAgency · NE, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Nebraska Department of Transportation
State AgencyNE
Posted
Sep 10, 2026
Oct 1, 2026
Signal infrastructure phase e2.
CityNE
Posted
-
Oct 1, 2026
The Nebraska Department of Transportation is soliciting sealed bids for the City of Omaha’s Signal Infrastructure Phase E2 transportation construction project, which is a federal-aid construction procurement rather than a grant program. The work includes upgrading traffic signals and communications infrastructure, replacing 114 existing signals, installing fiber optic cable, conduit, detection systems, cameras, pull boxes, and related traffic-control improvements in Douglas County. Bids are due October 1, 2026, at 1:30 p.m., and the contract is expected to begin April 1, 2027, with a 153-calendar-day duration.
FederalVA
Posted
Aug 11, 2026
Sep 24, 2026
Work includes approx 4 EA adjust manhole to grade with adjustment ring; 628 LF of 21" CIPP liner; 1,843 LF of 24" pipe, cleaning and cctv; 5 EA lateral repair - non-person entry.
Higher EducationGA
Posted
Aug 25, 2026
Sep 15, 2026
The Board of Regents of the University System of Georgia is soliciting statements of qualifications for design-build services for Project No. J-475, Campus Infrastructure Phase III, at Clayton State University in Morrow, Georgia. The project will address deficiencies in aging utility systems through domestic water, sewer, stormwater, and GIS as-built drawing improvements. The selected firm will provide design, preconstruction, construction management, safety management, and coordination services, with design-builder services anticipated to begin in Fall 2026.
Decision makers connected to this RFP from Nebraska Department of Transportation.