CityOH
Jul 30, 2026
Closes
Aug 13, 2026
Jefferson Wastewater Treatment Plant Clarifier Improvements - Phase 2 RFP
Provide Jefferson Wastewater Treatment Plant Clarifier Improvements - Phase 2.
Description: Work includes approx 780 LF 10" CIPP sewer main rehabilitation by resin; 30 EA CIPP reinstatement of service connections; 630 LF 8" SDR35 PVC sewer main; 630 LF type A surface restoration.
City · MT, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Shelby.
Adjacent opportunities open for bidding right now.
CityOH
Jul 30, 2026
Closes
Aug 13, 2026
Provide Jefferson Wastewater Treatment Plant Clarifier Improvements - Phase 2.
School DistrictNV
Jul 24, 2026
Closes
Aug 21, 2026
Work inlcudes install a new irrigation mainline and new irrigation piping, replace sod in all areas disturbed by construction and adjust and/or add sprinkler heads as necessary to provide complete head-to-head coverage.
CityVA
Jul 13, 2026
Closes
Sep 15, 2026
Work includes upgrades to existing structures and processes; the addition of new facilities; the relocation, demolition, and installation of underground utilities; startup of new solids processing facilities; and all related incidentals. Replacement of digested sludge storage tank B is also included in the work.
CityTX
Jul 20, 2026
Closes
Aug 24, 2026
Work consist of 113 sy of hot mix asphalt concrete pavement, 62 lf of concrete curb and gutter (excavation), 1 ea of connection to existing wastewater line, 4 ea of pre-cast polymer concrete manhole, w/pre-cast base, 2 ea of drop manhole with pre-cast base, 3,794 lf of trench excavation safety protection systems, 1,252 lf of pipe, 12" dia. C900 PVC, 639 lf of factory restrained joint pipe, 12" dia. C900 pvc, 14 lf of pipe, 8" dia. PVC, 1,777 lf of pipe, 30" dia. PVC, 78 lf of pipe, 48" dia. PVC, 1.72 tn of ductile iron fittings, 2 ea of 12" gate valve, 2 ea of drain valve assemblies, 2,295 lf of silt fence, barricades, signs, & traffic handling , temporary wastewater bypass pumping.