CityWA
May 7, 2026
Closes
Nov 27, 2026
Description: Work includes upgrades to existing structures and processes; the addition of new facilities; the relocation, demolition, and installation of underground utilities; startup of new solids processing facilities; and all related incidentals. Replacement of digested sludge storage tank B is also included in the work.
City · VA, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Town of Leesburg.
Adjacent opportunities open for bidding right now.
CityWA
May 7, 2026
Closes
Nov 27, 2026
The City of University Place is seeking bids for the 67th Avenue Phase 1 Improvements roadway project. The project provides curbs, gutters, landscaped pedestrian buffers, six-foot sidewalks, five-foot bicycle lanes, median islands, street lights, and asphalt paving. The estimated construction start date is July 15, 2026, with estimated completion on November 27, 2026.
Flora Vista Mutual Domestic Water Association
Special DistrictNM
Aug 15, 2026
Closes
Sep 4, 2026
The project includes replacing approximately 14,000 lf of existing waterline with new 6" c900 pvc waterline, installation of four pressure reducing valves and construction of a water haul station.
CityWA
May 7, 2026
Closes
Nov 27, 2026
The City of University Place is seeking bids for the 67th Avenue Phase 1 Improvements roadway project. The project provides curbs, gutters, landscaped pedestrian buffers, six-foot sidewalks, five-foot bicycle lanes, median islands, street lights, and asphalt paving. The estimated construction start date is July 15, 2026, with estimated completion on November 27, 2026.
CityTX
Jul 20, 2026
Closes
Aug 31, 2026
Work consist of 113 sy of hot mix asphalt concrete pavement, 62 lf of concrete curb and gutter (excavation), 1 ea of connection to existing wastewater line, 4 ea of pre-cast polymer concrete manhole, w/pre-cast base, 2 ea of drop manhole with pre-cast base, 3,794 lf of trench excavation safety protection systems, 1,252 lf of pipe, 12" dia. C900 PVC, 639 lf of factory restrained joint pipe, 12" dia. C900 pvc, 14 lf of pipe, 8" dia. PVC, 1,777 lf of pipe, 30" dia. PVC, 78 lf of pipe, 48" dia. PVC, 1.72 tn of ductile iron fittings, 2 ea of 12" gate valve, 2 ea of drain valve assemblies, 2,295 lf of silt fence, barricades, signs, & traffic handling , temporary wastewater bypass pumping.