Summary
Work consist of 113 sy of hot mix asphalt concrete pavement, 62 lf of concrete curb and gutter (excavation), 1 ea of connection to existing wastewater line, 4 ea of pre-cast polymer concrete manhole, w/pre-cast base, 2 ea of drop manhole with pre-cast base, 3,794 lf of trench excavation safety protection systems, 1,252 lf of pipe, 12" dia. C900 PVC, 639 lf of factory restrained joint pipe, 12" dia. C900 pvc, 14 lf of pipe, 8" dia. PVC, 1,777 lf of pipe, 30" dia. PVC, 78 lf of pipe, 48" dia. PVC, 1.72 tn of ductile iron fittings, 2 ea of 12" gate valve, 2 ea of drain valve assemblies, 2,295 lf of silt fence, barricades, signs, & traffic handling , temporary wastewater bypass pumping.