Perform home rehabilitation and repair projects in 2026 and 2027. Work includes electricians, plumbers, HVAC, and general subcontractors.
Description: Work includes, but is not limited to, 18,000 LF of pre-construction cleaning and televising, 18,000 LF of CIPP lining, 10 mainline grouts, as well as all associated site grading, paving, roadway, and parkway restoration. See attached file.
City · IL, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of Joliet.
Adjacent opportunities open for bidding right now.
OtherMI
Posted
Sep 3, 2026
Dec 18, 2026
Perform home rehabilitation and repair projects in 2026 and 2027. Work includes electricians, plumbers, HVAC, and general subcontractors.
CityIL
Posted
Sep 3, 2026
Sep 30, 2026
Installation of approx. 2,904 LF of C900 Certa-Lok 8" PVC Watermain (alternate HDPE DR11, 8" Watermain) installed by directional bore method, including fire hydrants, valves, water services, and other miscellaneous items of work.
CountySC
Posted
Aug 18, 2026
Sep 16, 2026
Provide two new generators for the fire department. Each installation shall include, at a minimum: Removal of the existing generator system. Removal of the existing automatic transfer switch (ATS), where required. Installation of a new liquid-cooled standby generator. Installation of a new Service Entrance Rated Automatic Transfer Switch. Installation of all required raceways, wiring, conduit, control wiring, disconnects, and associated electrical equipment. Gas piping and associated materials required for operation. Generator startup and commissioning. Operational testing under load. Manufacturer activation.
Massachusetts Department of Conservation and Recreation
State AgencyMA
Posted
Jul 7, 2026
Dec 3, 2026
Winter 2027 affordable housing competition for rental projects. The need to provide more affordable rental housing in Massachusetts is one of the state's most significant challenges. Production of new units in recent years has been impacted by high development costs, high interest rates, supply chain disruptions, zoning issues, changes to federal programs, and other factors. The need for additional affordable units heavily impacts lower-wage earners, homeless families and individuals, and frail seniors, as well as many other Massachusetts households.