Generator Replacement Projects (FIRE) RFP
Aug 18, 2026
Closes
Sep 16, 2026
Provide two new generators for the fire department. Each installation shall include, at a minimum: Removal of the existing generator system. Removal of the existing automatic transfer switch (ATS), where required. Installation of a new liquid-cooled standby generator. Installation of a new Service Entrance Rated Automatic Transfer Switch. Installation of all required raceways, wiring, conduit, control wiring, disconnects, and associated electrical equipment. Gas piping and associated materials required for operation. Generator startup and commissioning. Operational testing under load. Manufacturer activation.