Creek Crossing Repairs
Posted
Aug 19, 2026
Sep 20, 2026
Work includes replacing existing culverts with 72" RCP units, roadway reconstruction with GAB and concrete surfacing, ditch and spillway installation, and rip rap armoring with geotextile to improve hydraulic capacity, reduce flooding, and protect embankments.
