Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace approx 6,070 lf of 6" and 8" asbestos cement (AC) water main with 4" and 8" DI water main, install 4" PVC drain pipe, and replace fire hydrants, valves, blow offs, and meter boxes. Install water services lines from new and existing mains to the meter and install a zone valve and vault. Construct asphalt concrete patch and overlay, cement concrete driveway repair, and surface restoration. Fill existing water mains with controlled density fill (CDF) and abandon in place. Perform full width grind and overlay of roadway where new DI main has been installed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of water main replacement.
Posted Date
Dec 7, 2025
Due Date
Feb 13, 2026
Release: Dec 7, 2025
Close: Feb 13, 2026
Project consists of water main replacement.
Available1,567 LF of 8" trenchless PVC water main and 80 LF of 8" trenched water main. Other associated improvements include: full depth PCC pavement patching, removal & replacement of existing driveway, removal & replacement of sidewalk pavement, fire hydrant removal and installation, water service installation, erosion control, surface restoration and miscellaneous associated work necessary to complete the project.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
1,567 LF of 8" trenchless PVC water main and 80 LF of 8" trenched water main. Other associated improvements include: full depth PCC pavement patching, removal & replacement of existing driveway, removal & replacement of sidewalk pavement, fire hydrant removal and installation, water service installation, erosion control, surface restoration and miscellaneous associated work necessary to complete the project.
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 29, 2026
Release: Dec 3, 2025
Close: Jan 29, 2026
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
AvailableInstall new sanitary sewer and water main along street along with all necessary appurtenances.
Posted Date
Jan 9, 2026
Due Date
Jan 27, 2026
Release: Jan 9, 2026
Close: Jan 27, 2026
Install new sanitary sewer and water main along street along with all necessary appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis