Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Soos Creek Water And Sewer District 58
Replacement of approx. 140 water services, cutting into gate valves, meter boxes, and new water service lines from the existing water main to the meter. All work shall be done by trenchless means. Asphalt windowing removal at the water main will be included, as well as asphalt concrete patch and overlay; cement concrete driveway repair, and surface/landscape restoration. A portion of the existing service lines will be removed as noted. Most of the existing water service lines will be abandoned in place after the new service lines have been pulled into place.
Posted Date
-
Due Date
Mar 31, 2026
Soos Creek Water And Sewer District 58
Close: Mar 31, 2026
Replacement of approx. 140 water services, cutting into gate valves, meter boxes, and new water service lines from the existing water main to the meter. All work shall be done by trenchless means. Asphalt windowing removal at the water main will be included, as well as asphalt concrete patch and overlay; cement concrete driveway repair, and surface/landscape restoration. A portion of the existing service lines will be removed as noted. Most of the existing water service lines will be abandoned in place after the new service lines have been pulled into place.
Soos Creek Water And Sewer District 58
Principal items of work included in Cascade Vista Phase 1 AC main replacement, Contract 01-2025W, are the replacement of approx. 5,720 LF of existing 4", 6", and 8" asbestos cement (AC) water main with 4", 8", and 12" ductile iron (DI) water main; replacement of fire hydrants, valves, blow offs, meter boxes, water service lines from the new water main to the meter; asphalt concrete patch and overlay; cement concrete sidewalk, driveway, and curb and gutter repair; and surface restoration. The existing water mains will be abandoned in place after being filled with controlled density fill (CDF) and the existing roadway will have a half width grind and overlay performed where new DI main has been installed. Principal items of Work included in SE 202nd Place AC main replacement, contract 05-2025W, are the replacement of approx. 4,974 LF of existing 4", 6", and 8" asbestos concrete (AC) water main with 5,430 LF of 4", 8", and 16" ductile iron (DI) water main, replacement of fire hydrants, valves, blow offs, meter boxes, water service lines from the new water main to the meter; asphalt concrete patch and overlay; cement concrete driveway repair, and surface restoration. The existing water mains will be abandoned in place after being filled with controlled density fill (CDF) and the existing roadway will have a half width grind and overlay performed where new DI main has been installed.
Posted Date
Feb 23, 2026
Due Date
Mar 12, 2026
Release: Feb 23, 2026
Soos Creek Water And Sewer District 58
Close: Mar 12, 2026
Principal items of work included in Cascade Vista Phase 1 AC main replacement, Contract 01-2025W, are the replacement of approx. 5,720 LF of existing 4", 6", and 8" asbestos cement (AC) water main with 4", 8", and 12" ductile iron (DI) water main; replacement of fire hydrants, valves, blow offs, meter boxes, water service lines from the new water main to the meter; asphalt concrete patch and overlay; cement concrete sidewalk, driveway, and curb and gutter repair; and surface restoration. The existing water mains will be abandoned in place after being filled with controlled density fill (CDF) and the existing roadway will have a half width grind and overlay performed where new DI main has been installed. Principal items of Work included in SE 202nd Place AC main replacement, contract 05-2025W, are the replacement of approx. 4,974 LF of existing 4", 6", and 8" asbestos concrete (AC) water main with 5,430 LF of 4", 8", and 16" ductile iron (DI) water main, replacement of fire hydrants, valves, blow offs, meter boxes, water service lines from the new water main to the meter; asphalt concrete patch and overlay; cement concrete driveway repair, and surface restoration. The existing water mains will be abandoned in place after being filled with controlled density fill (CDF) and the existing roadway will have a half width grind and overlay performed where new DI main has been installed.
Soos Creek Water And Sewer District 58
Demolition and decommissioning of a below grade fuel tank, demolition of a backup generator, installation of a new backup generator and subbase fuel tank, and associated electrical.
Posted Date
Feb 6, 2026
Due Date
Mar 3, 2026
Release: Feb 6, 2026
Soos Creek Water And Sewer District 58
Close: Mar 3, 2026
Demolition and decommissioning of a below grade fuel tank, demolition of a backup generator, installation of a new backup generator and subbase fuel tank, and associated electrical.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge