Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of water main replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Construction of E. Elm Street Transmission Main Improvements, including installation of 1,250 LF of 16-inch and 70 LF of 8-inch C900 PVC water main, valves, fire hydrant assemblies, and E. Elm Street reconstruction involving HMA, crushed surfacing, and excavation.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Install 1,250 LF of 16" C900 PVC water main and 70 LF of 8" C900 PVC water main with valves and fire hydrant assemblies. Reconstruct East Elm Street including 650 tons HMA, 1,300 tons CSBC, 600 tons CSTC, and 1,200 CY unclassified excavation.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Install 1,250 LF of 16" C900 PVC water main and 70 LF of 8" C900 PVC water main with valves and fire hydrant assemblies. Reconstruct East Elm Street including 650 tons HMA, 1,300 tons CSBC, 600 tons CSTC, and 1,200 CY unclassified excavation.
AvailableProject consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
AvailableThe Quarryville Borough Authority issued an Invitation to Bid (ITB) for the North Hess Street Water Main Replacement to install approximately 380–390 feet of 8-inch water main, valves, hydrant(s), and services, with trench restoration and related work. Bids must be submitted online via PennBid (BonfireHub) and a mandatory pre-bid meeting is scheduled for January 22, 2026 at 9:00 AM at the Quarryville Borough Authority office. Bids are due online by 10:00 AM on February 10, 2026, and a 10% bid bond and performance/payment bonds (100% of contract) will be required of the successful bidder.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
The Quarryville Borough Authority issued an Invitation to Bid (ITB) for the North Hess Street Water Main Replacement to install approximately 380–390 feet of 8-inch water main, valves, hydrant(s), and services, with trench restoration and related work. Bids must be submitted online via PennBid (BonfireHub) and a mandatory pre-bid meeting is scheduled for January 22, 2026 at 9:00 AM at the Quarryville Borough Authority office. Bids are due online by 10:00 AM on February 10, 2026, and a 10% bid bond and performance/payment bonds (100% of contract) will be required of the successful bidder.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →