Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Premium
Access the largest public sector contact database
The Quarryville Borough Authority issued an Invitation to Bid (ITB) for the North Hess Street Water Main Replacement to install approximately 380–390 feet of 8-inch water main, valves, hydrant(s), and services, with trench restoration and related work. Bids must be submitted online via PennBid (BonfireHub) and a mandatory pre-bid meeting is scheduled for January 22, 2026 at 9:00 AM at the Quarryville Borough Authority office. Bids are due online by 10:00 AM on February 10, 2026, and a 10% bid bond and performance/payment bonds (100% of contract) will be required of the successful bidder.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
The Quarryville Borough Authority issued an Invitation to Bid (ITB) for the North Hess Street Water Main Replacement to install approximately 380–390 feet of 8-inch water main, valves, hydrant(s), and services, with trench restoration and related work. Bids must be submitted online via PennBid (BonfireHub) and a mandatory pre-bid meeting is scheduled for January 22, 2026 at 9:00 AM at the Quarryville Borough Authority office. Bids are due online by 10:00 AM on February 10, 2026, and a 10% bid bond and performance/payment bonds (100% of contract) will be required of the successful bidder.
AvailableInstallation of approximately 2,505 linear feet of new water main and associated valves, services, meters, fire hydrants and fittings. The project also includes other items incidental to the infrastructure replacement, such as: sediment & erosion control; disposal of materials removed; maintenance of traffic, and restoration of disturbed areas including driveways, curb and gutter, pavement, site restoration and other related items as identified in the Contract Documents.
Posted Date
Nov 9, 2025
Due Date
Dec 18, 2025
Release: Nov 9, 2025
Close: Dec 18, 2025
Installation of approximately 2,505 linear feet of new water main and associated valves, services, meters, fire hydrants and fittings. The project also includes other items incidental to the infrastructure replacement, such as: sediment & erosion control; disposal of materials removed; maintenance of traffic, and restoration of disturbed areas including driveways, curb and gutter, pavement, site restoration and other related items as identified in the Contract Documents.
AvailableWork consists of replacement of water mains. See outside link.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
Work consists of replacement of water mains. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.