Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Borough of Quarryville
Resurfacing of approx. 0.50 miles. Work also includes the paving of two ADA parking spots, installation of hardscape features, replacement of bridge railings, and placement of signing and pavement markings.
Posted Date
May 25, 2026
Due Date
Jul 1, 2026
Release: May 25, 2026
Borough of Quarryville
Close: Jul 1, 2026
Resurfacing of approx. 0.50 miles. Work also includes the paving of two ADA parking spots, installation of hardscape features, replacement of bridge railings, and placement of signing and pavement markings.
AvailableBorough of Quarryville
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Borough of Quarryville
Close: Feb 10, 2026
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Borough of Quarryville
Installation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Borough of Quarryville
Close: Dec 4, 2025
Installation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not a practical path here—pivot directly to COSTARS.
Coops: Lead with COSTARS to bypass formal bidding. Confirm your product is on a COSTARS contract and coordinate with the department head.
Borough of Quarryville: No evidence of sole source contracting; the Borough defaults to competitive processes. Deprioritize sole source and route through COSTARS to avoid delays.
Board meetings and strategic plans from Borough of Quarryville
The meeting focused on several land development and engineering matters. The Commission reviewed and approved multiple waiver requests for Level Edge Construction regarding the Subdivision and Land Development Ordinance and Stormwater Ordinance, contingent upon engineering reviews. They also recommended that the Council approve a stormwater management plan for the property at 40 N. Church Street and a request from Keen & Green, LP, to waive plan processing to Eden Township. Furthermore, the Commission was informed of an upcoming Town Hall meeting.
The meeting included reports from several committees. The Services, Agreement and Personnel committee is working on a new non-uniform retirement plan for employees. The Planning Commission provided an update on the WaWa development project timeline. The Streets, Infrastructure and Parks committee reported on ongoing projects, including signal pre-emption, path paving, culvert repairs, and various street maintenance tasks. The Police Chief Search Committee outlined the recruitment process, noting that interviews for the position are scheduled to begin in mid-May. The Borough Manager reviewed community events and announced the implementation of a new water and sewer billing system featuring an online customer portal. During the public comment period, residents raised concerns regarding police coverage and traffic enforcement, solicitation, street sweeping effectiveness, property maintenance, business development, noise complaints, and infrastructure improvements.
The council meeting addressed several operational and community items. Presentations were given regarding a proposed fire tax and a resident's proposal for a community clean-up weekend. The council approved the appointment of a delegate for the PSAB Conference, authorized the maintenance department to conduct park mulching, and approved a significant bond reduction for a development project. Additionally, the council supported a local fundraising event, reviewed upcoming appeals board matters, and authorized the 30% match requirement for a grant application related to street reconstruction. Discussions also included electric pricing strategies, a memorial page addition, and the coordination of fire police services.
The committee discussed several ongoing infrastructure and maintenance projects, including the West State/Fourth intersection improvements, the installation of parking restriction signs on Third and Fifth Streets, and potential pipe repairs at Park Ave. Members reviewed plans for the Maple Avenue reconstruction project, environmental approval for the Lime and State Street traffic signal, and plans for a traffic study on 4th Street. Additionally, the committee addressed the evaluation of basketball nets in the right of way, pedestrian crossing signage issues on Hess Street, and the potential need for upgrades to the municipal building following a facility evaluation.
The council reviewed and accepted the 2025 Borough Audit Report. Management updates included approval for conference attendance, authorization to proceed with the ELGT Connector Phase 2 project contingent on maintenance agreements, and payment of the 2025 budget true-up to the Quarryville Borough Authority. Council discussed and initiated a Snow Emergency Plan, adopted the Lancaster County Hazard Mitigation Plan update, and approved fire police requests for upcoming community events. Appointments were made for the Trail Towns Initiative, and authorization was granted for grant acquisition for the Maple Avenue Reconstruction Project. The council also ratified monthly financial reports and bills, reviewed departmental reports, and moved to expand enforcement of the property maintenance ordinance. Additionally, the council held an executive session to discuss personnel and retirement plan procedures.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Borough of Quarryville's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge