Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of approx. 690 LF of 8" and 40 LF of 18" DIP gravity sewer main, four (4) manholes, 110 LF of 16" steel casing jack and bore installation, restoration of all disturbed areas to pre-construction conditions, and all other appurtenance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project includes: the construction of approx. 400 linear feet of gabion wall and approx. 300 linear feet of a new 24-inch wastewater main including services reconnections, manholes and abandonment of the existing main along of the south bank of Little Booger Creek. The Project has an expected duration of 180 calendar days.
Posted Date
Jan 3, 2026
Due Date
Jan 29, 2026
Release: Jan 3, 2026
Close: Jan 29, 2026
Project includes: the construction of approx. 400 linear feet of gabion wall and approx. 300 linear feet of a new 24-inch wastewater main including services reconnections, manholes and abandonment of the existing main along of the south bank of Little Booger Creek. The Project has an expected duration of 180 calendar days.
AvailableWork includes relocation of the existing combined sewer collection system.
Posted Date
Jan 21, 2026
Due Date
Feb 17, 2026
Release: Jan 21, 2026
Close: Feb 17, 2026
Work includes relocation of the existing combined sewer collection system.
AvailableThe City of Vancouver is soliciting bids for the NE 60th Street Sewer Improvements to furnish and install approximately 3,842 lineal feet of 8-inch PVC gravity sewer main and 440 lineal feet of 2-inch Schedule 40 PVC pressure sewer main, including laterals, manholes, and appurtenances. The contract requires physical completion within 60 working days from notice to proceed and includes bidder requirements such as Washington UBI, registration, and apprenticeship utilization compliance. This is an Invitation to Bid (ITB) for construction (not a grant) and is posted and managed on the City of Vancouver's Bonfire procurement portal.
Posted Date
Jan 13, 2026
Due Date
Feb 10, 2026
Release: Jan 13, 2026
Close: Feb 10, 2026
The City of Vancouver is soliciting bids for the NE 60th Street Sewer Improvements to furnish and install approximately 3,842 lineal feet of 8-inch PVC gravity sewer main and 440 lineal feet of 2-inch Schedule 40 PVC pressure sewer main, including laterals, manholes, and appurtenances. The contract requires physical completion within 60 working days from notice to proceed and includes bidder requirements such as Washington UBI, registration, and apprenticeship utilization compliance. This is an Invitation to Bid (ITB) for construction (not a grant) and is posted and managed on the City of Vancouver's Bonfire procurement portal.
AvailableThe major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
Posted Date
Oct 29, 2025
Due Date
Feb 5, 2026
Release: Oct 29, 2025
Close: Feb 5, 2026
The major work will consist of the (approximate) following: pavement and traffic signal improvements at parkway and street intersection improvements. In addition, the project includes minor drainage, utility, illumination, pavement markings, and signage improvements. Also includes 1,200 CY of block sod placement; 4,386 SF of remove sidewalk; 4,731 SY of 10" concrete pavement; 70 LF of 12" DIP water (class 350), see attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis