Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Maintenance dredge of approx., eight hundred (800) CY of material to approximately a depth of minus five foot (-5') mean low water line, twenty-five feet (25') wide by five hundred (500') long from the channel marker. Remove the old channel markers and install two (2) new piles as well as the signs. Restore the existing seawall with new seawall installed against existing seawall, and replenish riprap at the jetties to the original approved design. Install seawall along the inside of channel directly adjacent to existing steel seawall. Installed system shall be comparable to the existing vinyl seawall construction, including stainless steel tiebacks and an aluminum cap.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close:
Premium
Access the largest public sector contact database
Maintenance dredge of approx., eight hundred (800) CY of material to approximately a depth of minus five foot (-5') mean low water line, twenty-five feet (25') wide by five hundred (500') long from the channel marker. Remove the old channel markers and install two (2) new piles as well as the signs. Restore the existing seawall with new seawall installed against existing seawall, and replenish riprap at the jetties to the original approved design. Install seawall along the inside of channel directly adjacent to existing steel seawall. Installed system shall be comparable to the existing vinyl seawall construction, including stainless steel tiebacks and an aluminum cap.
AvailableProposed street overlay project.
Posted Date
Dec 6, 2025
Due Date
Jan 6, 2026
Release: Dec 6, 2025
Close: Jan 6, 2026
Proposed street overlay project.
AvailableThis project involves full depth patching of deteriorated pavement areas, followed by milling and overlay to restore surface quality and extend pavement life. 1 LS mobilization; 1 EA traffic control; 1400 TN 3" asphalt surface; 8571 SY cold milling (2-3").
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
This project involves full depth patching of deteriorated pavement areas, followed by milling and overlay to restore surface quality and extend pavement life. 1 LS mobilization; 1 EA traffic control; 1400 TN 3" asphalt surface; 8571 SY cold milling (2-3").
AvailableThis project involves full depth patching of deteriorated pavement areas, followed by milling and overlay to restore surface quality and extend pavement life. 1 LS mobilization; 1 EA traffic control; 1400 TN 3" asphalt surface; 8571 SY cold milling (2-3").
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
This project involves full depth patching of deteriorated pavement areas, followed by milling and overlay to restore surface quality and extend pavement life. 1 LS mobilization; 1 EA traffic control; 1400 TN 3" asphalt surface; 8571 SY cold milling (2-3").
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis