RFB-275-26 Willisburg Lake Dam Rehabilitation Project
Jun 11, 2026
Closes
Aug 31, 2026
The Commonwealth of Kentucky, Energy and Environment Cabinet (Division of Water) is soliciting bids for the rehabilitation of Willisburg Lake Dam, including construction of a reinforced concrete auxiliary spillway, a rockfill stability berm, a new low-level drawdown valve, site preparation, erosion and sediment control, and demolition of existing infrastructure. A pre-bid meeting and site visit are scheduled for 2026-06-18; bidders must submit through the Commonwealth's eProcurement system and comply with required health and safety and water diversion planning. The solicitation opened on 2026-06-11 and closes on 2026-08-31, and is an Invitation for Bid (construction procurement), not a grant.
